Ratekon projects
Projects
Dewatering assessment for a power generation facility
Rabigh, Saudi Arabia
A MODFLOW groundwater model established dewatering requirements for works at a power generation site.Energy
Groundwater modelling for deep excavation dewatering
Abu Dhabi, United Arab Emirates
Numerical groundwater modelling established dewatering requirements for deep excavations on a waterfront development.Construction & Tunnelling
Dating structural movement against an adjacent excavation
Dubai, United Arab Emirates
A structure beside an active excavation was moving. Seventeen months of satellite measurement established when the movement began.Construction & Tunnelling
Separating operational settlement from structural risk at an industrial plant
Eastern Province, Saudi Arabia
26,000 measurement points across an industrial site distinguished settlement that was a normal consequence of operations from settlement that was not.Tailings & Mining
Reconciling visible damage with measured foundation settlement
Jeddah, Saudi Arabia
Two towers showed damage of disputed origin. Satellite measurement established what had actually moved, by how much, and when.Real Estate
Verifying reported earthworks defects across a residential complex
Al Wakrah, Qatar
Independent satellite measurement confirmed settlement at five locations a contractor had already flagged, and found movement the site records had not.Construction & Tunnelling
